Project Detail
Project: Proposed Addition &Alteration To the existing covered Linkway (Part) on LOT 04788n pt mk At West Camp Road
Client: Aircraft Support Industries Pte Ltd
Scope of work: Supply and Install New Link Way at Jet Aviation Project
Duration: Sept 2014 – 6 March 2015