Academy, Education, Institution & Other University Projects

Project Name : Proposed Educational Institution Building Comprising of 6 Storey Educational Block, 2 Storey of Sports and Recreation Block with Carpark and Communal Facilities on Lot 2690A MK16 at Dairy Farm Road, Dairy Farm Heights, Dairy Farm Lane
Scope of Work :

Supply, Fabricate and Installation of Fencing Works and Gates at Sport Recreational Block and Educational Block

Project Name : Proposed Addition of 2 Single Storey Reading Rooms at 2nd Storey Mezzanine North Spine Nanyang Technological University at Nanyang Avenue (Western Water Catchment)
Scope of Work : Supply and Installation of Glass & Aluminum Screen and Steelworks
Project Name : Proposed Addition of a Single Storey Laboratory Facility at Block N1.1 Level B2 for Division of Earth Sciences at Nanyang Technological University
Scope of Work : Supply and Installation of Steel Structure, Feature Wall and Glass Roof
Project Name : Proposed A & A Works for New Singapore Centre on Environmental Life Science Engineering (Scelse) in School of Biological Sciences (North Wing) Nanyang Technological University at 60 Nanyang Drive (Spiral Staircase)
Scope of Work : Supply and Install of Steel Spiral Staircase
Project Name : Proposed Addition of 2-Storey Facilities for Optical Fiber Fabrication to Part Basement 5 & 6 of Blk S1, School of Electrical & Electronic Engineering at Nanyang Technological University (MCVD)
Scope of Work : Reinforced Concrete, Substructures, Superstructures and Staircase works
Project Name : Proposed Addition and Alteration Works for New Singapore Centre on Environmental Life Science Engineering (SCELSE) in School of Biological Sciences (North Wing) at Nanyang Technological University at (New Scanning Probe Lab)
Scope of Work :

Reinforced Concrete and Steel Structure Works

Project Name :

Proposed Additions of a Single Storey Lab Facility at 3rd Basement (at GL-A0 to A11/Y20A to Y22) and an Addition of a 2 Storey White Space Facility at Part 1st Basement & Part 1st Storey (at GL-3 to A7/Y22 to Y24A) at Block N3.1 at Nanyang Technological University MK 08 at Nanyang Avenue

Scope of Work 

Supply and Installation of Steel Structure and Bondek Sheet at B1 and L1

Project Name : Addition and Alteration for New Singapore Centre on Environmental Life Engineering (SCELSE) in School of Biological Science, Nanyang University
Scope of Work :

Structural Steel Work, Reinforced Concrete Work & Composite Structural Work

Project Name : New Glass Canopy at BCA Academy
Scope of Work :

Supply & Install of Glass Canopy with Aluminium Composite Panel

Project Name : Installation of Perimeter Fencing at National Shooting Centre including Car Park Area
Scope of Work : Supply, Fabricate and Installation of 3.5m H Perimeter Fencing with Barbed Wire and Concertina