Main Contractor: | Space Scope Pte Ltd |
Scope of Work: | Structural works including foundation, reinforced concrete and steel Architectural works including partitions, ceiling, floor and wall finished, etc. M&E works including electrical, sanitary & plumbing |
Duration: | Dec 2007 to Jun 2008 |
Owner: | Overseas Union Enterprise Pte Ltd |
Main Contractor: | Low Keng Huat (Singapore) Limited |
Scope of Work: | 1. Controlled structural and architectural demolition works. 2. Water seepage barrier for foundation and basement construction work. 3. External works including apron slab, road works and drain. |
Duration: | Apr 2008 to Oct 2009 |
Owner: | Jurong Town Corporation |
Main Contractor: | Shimizu Corporation |
Client: | Uniland Enterprises Pte Ltd |
Scope of Work: | Supply & Install Glazed and Composite Panel Linkway with Steel Frames and Foundation |
Duration: | May 2009 to Jan 2010 |
Owner: | Mapletree Investments Pte Ltd |
Main Contractor: | Shimizu Corporation |
Client: | Prime Structures Engineering Pte Ltd |
Scope of Work: | Supply & Install Glass Lift with Steel Frame & Aluminium Cladding |
Duration: | Apr 2009 to Mar 2010 |
Owner: | Mapletree Investments Pte Ltd |
Main Contractor: | Shimizu Corporation |
Client: | Prime Structures Engineering Pte Ltd |
Scope of Work: | Supply & Install Steel Structures for Green Wall and Green Roof |
Duration: | Dec 2009 to Mar 2010 |
Owner: | Marina Bay Sands |
Main Contractor: | Prime Structures Engineering Pte Ltd |
Client: | PSKW Engineering Pte Ltd |
Scope of Work: | Supply & Install Ned Kahn Art Wall with Flappers and Steel Frame |
Duration: | May 2009 to May 2011 |
Owner: | Marina Bay Sands |
Main Contractor: | Prime Structures Engineering Pte Ltd |
Scope of Work: | Installation of Cladding for Skypark |
Duration: | Feb 2010 to Apr 2010 |
Main Contractor: | Space Scope Pte Ltd |
Scope of Work: | Structural works including reinforced concrete foundation, slabs, beams, columns and steel framing for AHU and Outdoor benches Architectural works including partitions, ceiling, floor and wall finished, etc. M&E works including electrical, sanitary & plumbing |
Duration: | Apr 2010 to Oct 2010 |
Main Contractor: | Space Scope Pte Ltd |
Scope of Work: | Structural works including reinforced concrete foundation, slabs, beams, columns and steel staircase and roof frame. Architectural works including partitions, ceiling, floor and wall finished, etc. M&E works including electrical, sanitary & plumbing |
Duration: | May 2010 to May 2011 |
Main Contractor: | Space Scope Pte Ltd |
Scope of Work: | Structural works including steel staircase and steel frame sky light. Architectural works including partitions, ceiling, floor and wall finished, etc. M&E works including electrical, sanitary & plumbing |
Duration: | Jun 2010 to Dec 2010 |
Owner: | Great Newton Properties Pte Ltd |
Main Contractor: | Evan Lim & Co. Pte. Ltd. |
Client: | Kong Hwee Iron Works & Construction Pte. Ltd. |
Scope of Work: | Supply & Install Steel Frame Canopy with Powder Coated Aluminium and Tempered Glass Panels |
Duration: | Nov 2010 to Apr 2011 |
Owner: | Buildhome Pte. Ltd. |
Main Contractor: | Thian Sung Construction Pte. Ltd. |
Client: | Kong Hwee Iron Works & Construction Pte. Ltd. |
Scope of Work: | Supply & Install Pool Canopy and Aluminium Roof Cladding |
Duration: | Nov 2010 to Mar 2011 |
Owner: | Keppel Bay Pte Ltd |
Main Contractor: | Woh Hup (Private) Limited |
Scope of Work: | Design, Supply & Install Stainless Steel Wire Rope Square Grid System with Accessories for Green Wall |
Duration: | Feb 2011 to Mar 2011 |